# Operations scheduling view

Once the connection to SCTE 224 database has been configured, and operations mapped against those SCTE 224 events, **Stream Conditioning** service will automatically create and store the operations/actions into its scheduling & control database.

> **Info:** Scheduling view is only available if the service is started.

To visualize the scheduling & control timeline, follow these steps:

1. You can either:
   1. Click on the timeline button located at the top right corner of a **Stream Conditioning** configuration page.
      
   2. or click on the timeline button from the **Actions** list of configured service.

As a result, when events from the SCTE 224 database match criteria configured under **Stream Conditioning** service, the operations will appear in the timeline.
